The measurements in Naiband bay to Dayyer bay area was completed as the second phase of this project, in 2009. The important operations which have been implemented through this phase, are as follows:
• Current and wave measurement at 6 stations during one year.
 Tidal measurement at 3 stations during one year
• Shoreline measurement during one year and once a month
• Coast profiles measurement during one year and once each three month.
 Taking handy sediment samples in the plan area.
• Suspended sediment load measurement using O

Table 1 Locations of Field Measurment Instruments

 Boushehr2 Measurments Table

 

 

 Figure 1  Marine stations installation position in the second phase measurements   

Figure (1) Marine stations installation position in the second phase measurements

The executive jobs have been done in  the second phase of the projects:
• Workshop  equipping
• Completing the equipments relevant to measurement operation
• Preparing and equipping the office, housing place and other use equipments.
• Coordination with the relevant organizations in the area
Preparing the anchor system of measurement equipments
• Setting up and test of marine measurement equipments in the second phase.
Anchor system preparation and installing it in marine stations site.
Retrieval of the installed equipments and discharging the information and reinstalling them for twelve one- month periods.
Shoreline survoying  completely in two perids.
Finishing the coastal and marine profile surveying operation for three periods.
Survoying of coastal sediment samples and analysing the samples.
• Maintaining and utilization of the organizational buoy in naiband area
• Adding a wave and current station of sontek model in the location of LNG bay.
• Preparation of a professional education movie of the project 
Three levels of validation operations
Installing a wave station in Naiband area
• Visiting and checking the sea bed in naiband Bay and Tonbak area
• Cooperation in foreign consultant visiting of the project area and the shoreline surveying and also visiting the underwater environment at several stations
• Moving Naiband AQ3 station in two periods 

 

تجهیزات اندازه‏گیری دریایی مورد استفاده در فاز دوم1  

تجهیزات اندازه‏گیری دریایی مورد استفاده در فاز دوم2 

تجهیزات اندازه‏گیری دریایی مورد استفاده در فاز دوم3 

تجهیزات اندازه‏گیری دریایی مورد استفاده در فاز دوم4 

تجهیزات اندازه‏گیری دریایی مورد استفاده در فاز دوم5 

تجهیزات اندازه‏گیری دریایی مورد استفاده در فاز دوم6 

تجهیزات اندازه‏گیری دریایی مورد استفاده در فاز دوم7 

تجهیزات اندازه‏گیری دریایی مورد استفاده در فاز دوم8 

Figure (2) Marine measurement equipments used in the second phase

 

 مراحل راه‌اندازی، نصب و تست صحت سنجی تجهیزات در شروع پروژه1

مراحل راه‌اندازی، نصب و تست صحت سنجی تجهیزات در شروع پروژه2 

مراحل راه‌اندازی، نصب و تست صحت سنجی تجهیزات در شروع پروژه3 

مراحل راه‌اندازی، نصب و تست صحت سنجی تجهیزات در شروع پروژه4 

 Figure (3) Set up, install and validation test steps of equipments at the project beginning

 


Last Update : Jun 25, 2014 14:08